DeSantis: New lanes on Interstate 4 in Polk County will open week of April 28

3 weeks ago 12

Construction of “congestion alleviation lanes” connected Interstate 4 successful Polk County has finished up of schedule, Florida Gov. Ron DeSantis announced Monday.

The project, adding 1 lane successful each absorption of I-4 from U.S. 27 successful Polk County to World Drive successful Osceola County, volition beryllium unfastened for usage opening the week of April 28, DeSantis’ bureau said successful a quality release.

DeSantis announced the Moving Florida Forward inaugural past twelvemonth astatine a quality league successful Polk County. The programme includes astir 700 projects crossed Florida, with $75 cardinal successful infrastructure concern committed since 2019, the merchandise said.

The Polk County task  volition  adhd  tolled explicit  lanes successful  the median of I-4 from conscionable  westbound  of U.S. 27 to Championsgate, 2  going successful  each   direction. The explicit  lanes volition  necessitate  drivers to person  transponders for tolling successful  their vehicles oregon  look   fines

The Polk County task volition adhd tolled explicit lanes successful the median of I-4 from conscionable westbound of U.S. 27 to Championsgate, 2 going successful each direction. The explicit lanes volition necessitate drivers to person transponders for tolling successful their vehicles oregon look fines

DeSantis acceptable a extremity of completing the caller lanes connected I-4 successful Polk County by the extremity of this year.

FDOT launched the Moving I-4 Forward programme and introduced a caller modified phased design-build method, the merchandise said. To supplement the existing 3 lanes successful each direction, operation crews paved the interior breakdown lanes, converting them to postulation lanes.

Polk Parkway East: Polk County proscription committee connected toll road: Move quickly, support Bok Tower Gardens

FDOT is besides expediting full-build enactment astatine the County Road 532 and World Drive interchanges and preparing to motorboat much projects on the 14-mile corridor from U.S. 27 successful Polk County to State Road 536 successful Orange County, the merchandise said. Improvements see 2 caller explicit lanes and 1 wide usage lane successful each direction, interchange upgrades, span work, resurfacing and added information features.

The bureau is readying 3 large projects, including the caller Poinciana Connector, which volition statesman operation and finalizing engineering this summer, 2 years sooner than anticipated, the merchandise said. The caller roadway transportation volition nexus I-4 to S.R. 429 and the aboriginal Central Florida Expressway facility, serving 1 of Osceola and Polk Counties’ fastest-growing areas.

This nonfiction primitively appeared connected The Ledger: New lanes connected I-4 successful Polk County volition unfastened week of April 28

Read Entire Article